Placed earlier on the selling block, a total of 288 units—or 99 percent of units were already sold to new residents of Amaia Steps Capitol Central’s North Building. As for the South Building, which was launched last April, a total of 276 units—or 50 percent of units sold—will likewise be turned over by 2020. To date, the total projected number of South Building units for turnover is 169 units.
Showing posts with label Bacolod City. Show all posts
Showing posts with label Bacolod City. Show all posts
Monday, November 20, 2017
Amaia Land will turn over Steps Capitol Central North Building units to new homeowners
Monday, March 30, 2015
Amaia Steps condo launched at Capitol Central, Bacolod City
.jpg)
Kicking-off the residential component of the Capitol Central development is Amaia Steps Capitol Central - a mid-rise project with 9 floors and 288 residential units for its North Building. It is located along San Juan St., Brgy. 8, Bacolod City. Ayala Land’s subsidiary, Amaia Land Corp, which caters to the affordable housing segment, is the group behind this project.
Subscribe to:
Posts (Atom)